Case Studies / Minehead, Somerset

  • Coastal Exposure
  • Aiko Neostar 2S+ Dual Glass
  • 13.5kWh Storage

7.65kWp PV System, Minehead

Fifteen dual glass panels on an exposed coastal roof, with 13.5kWh of storage behind them. The household now runs on its own electricity for close to two thirds of the year.

  • 7.65kWpfifteen-panel array
  • 6,063kWh generated a year
  • 61%of demand met on site
The completed 7.65kWp all-black solar array on a roof in Minehead, Somerset, seen from the scaffold

Specification

The System at a Glance

An energy-hungry household on the west Somerset coast, where the wind comes in off the Bristol Channel and the roof has to hold an array through it. The specification answers both halves of that: generation sized to the demand, and a fixing method sized to the exposure. It is the same approach behind every solar panel installation we carry out.

Location

Minehead, Somerset

Setting

Coastal, exposed to Atlantic wind

System Size

7.65kWp

Panels

15 x Aiko Neostar 2S+ 510W Dual Glass

Inverter

GivEnergy 12kW All in One 2 hybrid

Storage

GivEnergy 13.5kWh All in One

Protection

Surge protection on DC and AC

Monitoring

Cloud telemetry, generation and load

Generation

6,063 kWh projected each year

Status

Completed and commissioned

Get a Spec for Your Roof

The survey establishes array size, orientation and storage before any quotation is prepared.

The Roof

A Coastal Roof and an Atlantic Wind

Fifteen 510W modules are heavy, and Minehead gets weather straight off the water. What holds an array on a roof here is not the rail you can see but the hooks underneath it and where they land, which is decided before a single panel is lifted. Our guide to how solar panels are installed follows the sequence through.

Before Anything Goes On

The roof is read first

Rafter positions are found and marked, and the usable area is set out against them. Everything after that follows the structure of the roof rather than the shape of the array.

The Fixing

Stainless hooks past the covering

High-grade stainless hooks pass the tiles and anchor into the rafters, so the modules become part of the building rather than something resting on its surface.

The Loading

Specified for thirty years of it

Wind loading on this site is calculated for the exposure, not for an average one, and the fixings are specified to carry it across the working life of the panels.

The bare tiled roof at the Minehead property before the solar array was fitted
The roof as we found it, before any fixings went in.
Ask About Your Roof

Exposed, sheltered, tile or slate, the survey establishes what your own roof needs.

Hardware

Dual Glass Panels and a Single Control Unit

A high-demand house on an exposed site pulls the specification in two directions: panels built to sit out the weather, and enough battery storage to carry a heavy evening load without reaching for the grid.

15 x Aiko Neostar 2S+ 510W Dual Glass

All Back Contact N-Type cells with glass on both faces rather than a polymer back sheet. The contacts sit behind the cell, which frees light-collecting area and leaves the roof reading as one flat black surface.

Why dual glass here: a glass-glass sandwich is stiffer than a back-sheet panel, which matters where salt air and wind loading are both in play, and it carries a 30-year performance warranty.
  • CellsAll Back Contact, N-Type
  • EfficiencyUp to 23.6%
  • Array15 modules, 7.65kWp total

GivEnergy All in One 2, 12kW and 13.5kWh

Inverter, battery and gateway in one unit, managing the flow between panels, storage and grid. The house is supplied first, the battery takes what is left, and only then does anything go out to the network.

Why 12kW of inverter: it sets how much can be drawn from storage at once. A heavy evening with an oven, a shower and a car on charge will beat a smaller unit, and the shortfall arrives from the grid at full price.
  • Inverter12kW All in One 2 hybrid
  • Storage13.5kWh All in One
  • ProtectionSurge protection, DC and AC

A note on this hardware. SolarGain no longer supplies GivEnergy equipment. The inverter and battery described here are what was installed on this project and the figures on this page describe that system as built. Storage on new installations now comes from the manufacturers set out on our battery storage page, and we will specify against your own demand at survey stage.

Aiko Neostar N-Type dual glass modules installed on the Minehead roof
The Neostar modules in place, the glass face reading as one plane.
Talk Through the Options

Panel, inverter and battery are chosen against your roof and your consumption, not a package.

Outcome

What the System Delivers

This is the largest storage capacity of any case study on the site, and it shows in the self-supply figure. It also shows in the payback, which is longer than a smaller system would give. Both facts belong on the same page.

Generation and return

6,063

kWh generated a year

Modelled for this roof, its pitch and its aspect rather than taken from a national average.

£1,240

Year-one saving

From lower import bills, evening discharge from storage and Smart Export Guarantee payments on the surplus.

61%

of demand met on site

Nearly two thirds of the year's electricity, which on a household of this size is what the 13.5kWh of storage buys.

Payback and carbon

12 yrs

Estimated payback

Longer than a smaller system, because more of the cost sits in storage and inverter capacity. The warranties run well past it.

1,232kg

CO2 avoided a year

Generation produced at the point of use rather than drawn from centralised fossil-fuel plant.

30t

across the warranted life

More than thirty tonnes over the period the panels are warranted for, on the same annual figure.

Aiko Neostar panels part-installed on the slate roof at Minehead
The array going down, rows filling from the eaves upwards.

Figures are modelled for this installation, using its array size, orientation and the household's own consumption pattern. Your property will produce its own set. For a smaller array with a shorter payback, see our 6.65kWp Bridgwater case study, and for a coastal roof on a lighter load the 5.58kWp Watchet case study.

See Your Own Numbers

We model generation, saving and payback for your property before you commit to anything.

Takeaways

What This Project Shows

A big system on a hard site, and the trade-offs are worth stating plainly. Three things carried this one, and more finished projects are shown in our solar panel installation gallery.

  • More storage buys self-supply, and costs you payback 13.5kWh takes this household to 61% of its own demand, higher than any other project on the site. It also stretches payback to twelve years. Which of those two numbers matters more is a decision for the household, not for us.
  • Exposure changes the fixings, not the feasibility A coastal roof is not a reason to fit a smaller array. It is a reason to calculate the wind loading for the site and to specify hooks and rails that will carry it for thirty years.
  • A system outlives the supply arrangements around it We no longer supply the brand of inverter and battery fitted here, and the system carries on working exactly as it did. Hardware is warranted by its manufacturer, and that does not change with who sells it.
Roof preparation at the Minehead property with fixings set out before the rails went on
Fixings set out on the roof before the rails and modules went up.
Book a Free Survey

Find out what your roof will carry and what it would generate, with no obligation.

Questions

Questions About This Installation

Why is the payback on this system twelve years rather than eight?

The payback here is twelve years because a larger share of the cost sits in storage and inverter capacity rather than in panels. Panels are the part that pays back fastest: they generate, and every unit generated is a unit not bought. A 13.5kWh battery and a 12kW inverter add a good deal to the total, and their return comes from the narrower margin between the import price and the export price. What that money buys is self-supply, which this household wanted, and the warranties run well beyond the twelve years. A smaller battery on the same array would pay back sooner and leave the house more dependent on the grid.

What does all in one mean on an inverter and battery?

An all in one unit means the inverter, the battery and the gateway that switches between grid and stored power are supplied as a single enclosure rather than as separate boxes wired together. In practice that means one unit on the wall, one app, one manufacturer to call, and usually a tidier installation. The alternative, separate components from different makers, can be more flexible and is sometimes cheaper, but there are more interfaces to go wrong and more than one warranty to chase if something does.

If my installer stops supplying a brand, what happens to my system?

Nothing happens to your system if your installer stops supplying that brand. Hardware is warranted by the manufacturer that made it, not by whoever sold it, and a system that is commissioned and working carries on working. SolarGain no longer supplies the brand of inverter and battery fitted on this project, and that has no bearing on the installation described here. If you need support on an existing system, call us either way, whether it is something we can put right ourselves or a manufacturer claim we can point you through.

Does a dual glass panel do anything a standard one does not?

A dual glass panel replaces the polymer back sheet of a standard panel with a second sheet of glass, which makes the module stiffer and better sealed against moisture reaching the cells. The stiffness reduces the micro-cracking that years of flexing can cause. Both matter most where wind loading is high or the air is salty, which describes this site. The trade-off is weight, and a heavier module puts more demand on the mounting and the roof structure, which is part of why the fixings here were specified the way they were.

How long is the scaffolding up for on an installation like this?

Scaffolding is usually up for around a week on an installation of this size, which is longer than the work on the roof itself takes. It goes up before the crew arrive and comes down after the work has been signed off, so a job that takes a couple of days on the roof still means several days of scaffold on the drive. It is arranged as part of the installation rather than being something you organise, and we will confirm the expected dates before anything is booked in.

Ask Us Anything Else

Call 0800 001 6258 or request a survey and we will answer it against your own property.

Next Step

Talk to Us About Your Roof

Minehead shows what a demanding household on an exposed roof can reach, and what it costs in payback to get there. SolarGain designs solar and storage across Somerset and the South West, and the survey deals with what your property has rather than what an ideal one would look like.

It covers the roof and its exposure, the shading across it, the supply and how the household uses electricity, all before a quotation is prepared. There is no charge and no obligation to proceed, and where it helps, the cost can be spread through solar finance.