• MCS Certified
  • TrustMark Approved
  • Which? Trusted Trader
  • Family Run

Solar Panels Avon

SolarGain covers the whole of the former county of Avon, which today means Bristol, Bath and North East Somerset, South Gloucestershire and North Somerset. We fit panels to Georgian terraces in Bath, Victorian streets in Bristol, family homes in Yate, Thornbury and Keynsham, and seaside properties in Weston-super-Mare, Clevedon and Portishead, always starting from the roof and the household's real electricity use.

Solar panels on a home in the Avon area
Covering Bristol, Bath, South Gloucestershire and North SomersetWe can usually fit within three weeks of you saying yes.
  • Free survey across all four Avon council areas
  • MCS certified, so exports qualify for SEG payments
  • Approved by TrustMark and Which? Trusted Trader
  • Family owned, with Vanessa and Phil Collins in charge
  • Experience with Bath and Bristol heritage properties
  • Network applications to NGED handled for you
  • Battery brands: Tesla, EcoFlow, Sigenergy, FoxESS, Growatt
  • 0% VAT on domestic panels and storage

Across Bristol, Bath, South Gloucestershire and North Somerset, SolarGain works as an MCS certified installer with TrustMark approval and Which? Trusted Trader endorsement, plus NAPIT registration, RECC membership and IWA Deposit Guarantee cover.

  • MCS Certified
  • TrustMark Approved
  • Which? Trusted Trader
  • NAPIT Registered
  • RECC Accredited
  • IWA Deposit Guarantee

Avon Solar PV

Solar Panel Installers in Avon

Period homes, family houses, flats and commercial buildings across all four Avon council areas are surveyed, designed, installed and commissioned by SolarGain's own team.

The county of Avon was abolished in 1996, but the name is still widely used for the area around Bristol and Bath. Today it is covered by four unitary councils, each acting as planning authority for its own area, which matters when a property is listed or sits in a conservation area.

The housing is as varied as anywhere in the South West. Bath's Georgian terraces and crescents sit within a World Heritage Site, Bristol has Victorian terraces climbing its hillsides and grand villas in Clifton, South Gloucestershire has large modern estates around Bradley Stoke, Emersons Green and Yate, and North Somerset runs from commuter villages to the coast at Weston-super-Mare and Clevedon. Each calls for a different fixing method, array layout and scaffold plan.

From a straightforward roof array to a full package with battery and EV charger, you can see what finished systems look like in our installation gallery.

1,600 hrsApproximate annual sunshine at the Met Office Long Ashton station near Bristol
3 WeeksTypical installation availability
4 CouncilsBristol, Bath and NE Somerset, South Glos, North Somerset

Why SolarGain

Three Reasons to Choose SolarGain in Avon

Real consumer protection on every job

SolarGain is certified under MCS, a member of RECC and assessed by Which? as a Trusted Trader, and all its installers are NAPIT accredited. Work across the Avon area is backed by a two year insurance backed workmanship guarantee and the manufacturers' product and performance warranties, while deposits are safeguarded by the IWA Deposit Guarantee.

300 plus systems across the South West

SolarGain's track record of more than 300 South West installations takes in listed terraces, steep city streets, new estates and exposed coastal homes, and those lessons decide the mounting kit, layout and scaffold approach across the Avon area.

No subcontractors, start to finish

Phil visits every home in person before designing anything. The family run team then takes care of the design, NGED paperwork, installation, commissioning, MCS registration and aftercare. Installation is usually possible within three weeks.

One Old County, Four Councils

Solar Across Bristol, Bath, South Gloucestershire and North Somerset

Each part of the former county brings its own housing, its own planning authority and its own questions.

Bristol

Victorian and Edwardian terraces, hillside streets and Clifton's listed villas sit alongside interwar and postwar suburbs. Bristol City Council is the planning and highway authority, so it also issues the scaffold and pavement licences many terraced streets need.

Bath and North East Somerset

The whole city of Bath is a World Heritage Site and much of it is listed or within a conservation area. Panels on rear and concealed roof slopes are usually the starting point, and listed building consent is needed for listed properties.

South Gloucestershire

Modern estates around Bradley Stoke, Emersons Green, Yate and Thornbury often have clear, unshaded roofs and space for a car charger on the drive, which makes them well suited to solar with battery storage.

North Somerset

Coastal homes in Weston-super-Mare, Clevedon and Portishead face wind and salt off the Severn Estuary. Panels, rails and fixings are specified for that exposure, with wind uplift calculated for each site.

Our Installation Services

Solar Panel Installation Services in Avon

Solar Panel Systems

Surveys across the Avon area record the usable roof, its pitch and aspect, any shading, and the condition of the covering, battens and rafters. That shapes the panel choice, layout and inverter. Installation covers scaffold, hooks, rails, clamps and flashing, DC and AC wiring, isolators, earthing and bonding, then testing, commissioning and MCS registration.

Solar Batteries

Storage keeps unused daytime generation for the evening. SolarGain fits lithium iron phosphate batteries from Tesla, EcoFlow, Sigenergy, FoxESS and Growatt, sized around when you're home, your evening use and your tariff, with off peak charging available on time of use plans. More on our solar battery storage page.

Batteries for Existing Panels

Already have panels? A battery can be added without changing the array, either AC coupled beside your current inverter or with a new hybrid inverter, depending on the age of the kit and your consumer unit. Our guide to adding battery storage to existing solar panels explains how.

Electric Car Charging

A smart charger installed with solar sends spare generation to the car ahead of the grid. Zappi and Tesla units read live output through a CT clamp, drop back to off peak power overnight and keep total demand within the supply's limit. See the home EV chargers page.

Performance Monitoring

Every system is connected to an app or portal at handover, showing generation, household use, battery level and import or export in real time, with daily, monthly and annual totals.

Improving Older Systems

For homes with ageing systems, SolarGain replaces inverters, adds panels where space and inverter headroom allow, fits optimisers to shaded strings, adds bird mesh and upgrades monitoring. Everything is checked against the existing array, inverter rating and network approval before we quote.

Suitability

Is Your Avon Home Suitable for Solar Panels?

The great majority of homes across the Avon area can host solar panels where the roof has enough open space, the structure is sound and the household uses a fair amount of electricity. South facing roofs produce the most over a year, and east or west slopes still perform while spreading output across the day.

Heritage and terraced streets need extra checks. Listed status, conservation areas and Bath's World Heritage Site designation affect where panels can go, and on terraced hillside streets scaffold access and pavement licences need planning. The survey measures what is actually available on your roof and records any consents needed before a quotation is issued.

Solar panels installed by SolarGain across the roofs of a South West housing development
Not south facing? It can still workWe'll show what your particular roof can produce.

During a solar panel survey in Avon, SolarGain assesses:

  • Usable area left after chimneys, dormers and rooflights
  • Pitch and aspect of each available slope
  • Roof covering, whether slate, clay tile, concrete tile or flat membrane
  • Rafter size and spacing, plus batten and felt condition
  • Shade from neighbouring buildings, chimneys and trees
  • Scaffold footprint, parking and any pavement licence
  • Your electricity use across the year, including heat pump or EV plans
  • Consumer unit capacity, earthing and cable routes
  • Listed building, conservation area or World Heritage Site status
  • Exposure to coastal wind on North Somerset properties

Some roofs should wait. A small north facing slope in shadow most of the day, or a covering near the end of its life, usually makes more sense after that work is done. If you're planning a heat pump or electric car, the design allows for that demand too.

The Process

How Are Solar Panels Installed in Avon?

Across the Avon area, solar is installed by surveying the property, designing the array, fixing mounts to the roof structure, fitting and wiring the panels, connecting the inverter and commissioning the system.

SolarGain carries out every stage itself, to BS 7671 and building regulations. To read more about fixings and parts, see our guide to how solar panels are installed.

  1. Visit and Design Phil comes to the property, looks at your bills, measures the roof and checks for shade, then specifies panels, inverter and battery for your actual demand.
  2. Notifying NGED SolarGain submits the G98 notice or G99 application to National Grid Electricity Distribution, the operator across Bristol, Bath, South Gloucestershire and North Somerset.
  3. Getting the Roof Ready Scaffold is erected, stainless hooks are fixed into the rafters and aluminium rails and flashing are fitted so no load sits on the tiles or slates.
  4. Installing the Array Panels are clamped to the rails using the edge clearances from the wind calculation and connected with weatherproof DC cable, isolators and surge protection.
  5. Inverter and Wiring The inverter, any battery and AC isolators are installed and wired into the consumer unit on a separate circuit, with correct earthing and bonding.
  6. Testing and Paperwork The system is tested, commissioned, registered with MCS and TrustMark, connected to monitoring and handed over with certificates.
Tesla Powerwall solar battery storage installed by SolarGain

Solar Plus Storage

How Do Panels and Batteries Work Together in the Avon Area?

Your appliances use solar power as it's made. Any extra fills the battery, and when that's full the surplus goes to the grid.

After dark the battery powers lighting, cooking, TV and overnight loads, saving you from peak rate grid electricity. On a time of use tariff it can also charge overnight at a lower price, and exported units can be paid for through the Smart Export Guarantee.

A battery alone won't keep things running in a power cut. That needs backup capable equipment and a changeover set up at installation, so mention it at survey if it matters. Spare solar can also go to an immersion heater or car charger before export.

  • Tesla
  • EcoFlow
  • Sigenergy
  • FoxESS
  • Growatt

Costs

How Much Do Solar Panels Cost in Avon?

Solar costs across the Avon area depend on system size in kWp, roof layout and covering, the products chosen, access to the building and whether a battery or EV charger is included. At the lower end you'll find one tiled slope with a modest array, and a split array on a listed terrace with high capacity storage sits at the other.

What moves the figure on a quotation:

  • Panel quantity and wattage, and the kWp they produce
  • Inverter type: string, hybrid or panel level optimisers
  • Battery chemistry and usable kWh
  • Scaffold height and access, which is more involved on steep terraced streets and tall Georgian houses
  • How many roof slopes are used, as splitting the array adds work
  • Slate hooks, low profile frames for valley roofs or other specialist fixings
  • Consumer unit upgrades, surge protection, earthing and cable lengths
  • Bird mesh and EV charger integration

After the survey, SolarGain provides a fixed written quotation based on your roof and usage. If you'd like to spread the cost, Hometree solar finance is available.

Tax Relief

Zero rated VAT on home solar

At present, solar panels and batteries installed on homes qualify for 0% VAT under the energy saving materials relief, which lowers the cost of eligible installations.

0%VAT on qualifying work
FixedQuotation after survey

Expected Output

How Much Electricity Can Solar Panels Generate in Avon?

Yearly output depends mainly on a system's kWp, the roof's direction and angle, any shading and the sunshine at the site. With some of the brighter skies in the country, a carefully sited array across Bristol, Bath and the surrounding districts generally yields about 900 to 1,050 kWh annually per kWp, which means roughly 3,600 to 4,200 kWh a year from a 4kWp home system.

An unshaded south facing roof at around 35 degrees sits at the top of the range, an east and west split slightly lower, and a roof partly shaded by a chimney or neighbour lower still. Generation is strongest from April to September, winter output relies on diffuse daylight at a much lower level, and the small yearly drop in panel output is covered by the performance warranty.

900–1,050 kWhTypical annual output per kWp installed on a well sited roof
1,600 hrsApproximate annual sunshine at the Met Office Long Ashton station
Site specificYour survey produces a generation estimate for your own roof
EcoFlow battery storage installed at a home in Taunton, Somerset

South West Installation Case Study

10.87kWp Solar PV in Taunton, Somerset

SolarGain installed a 10.87kWp array on a slate roof in Taunton with battery storage and app monitoring. The design, mounting and battery approach used there carry over to homes in Bristol, Bath and the surrounding districts. Read the 10.87kW Taunton case study.

Grid Connection

What Are DNO, G98 and G99 Requirements in Avon?

Across all four council areas that once made up Avon, the local network is run by National Grid Electricity Distribution (NGED), which owns the cables and substations between the national grid and your meter. Which connection route you follow depends on inverter output:

  • G98 applies up to 16 amps per phase, around 3.68kW on a normal single phase home, and SolarGain notifies NGED once the system is commissioned.
  • G99 applies above that, and NGED must approve the system before it's connected.

Parts of the South West network are busy, so bigger arrays, three phase systems and installs with large batteries usually go through G99 and may carry an export limit. SolarGain prepares and submits the paperwork.

Certification

What Are MCS Requirements?

MCS is the UK standard for designing and fitting small renewable systems. Certified installers must use approved products, follow MCS rules for design, wind loading and roof fixing, and give you an estimate of performance before starting.

When the work is complete, your system is registered and you receive an MCS certificate. Suppliers need it before paying you under the Smart Export Guarantee, and it supports the building regulations notification SolarGain makes via NAPIT.

Planning

Do You Need Planning Permission for Solar Panels in Avon?

Rarely. Most rooftop solar across Bristol, Bath, South Gloucestershire and North Somerset falls under permitted development, with no application needed.

Panels qualify as long as they sit no more than 200 millimetres off the roof, stay below its highest point, are placed to limit their effect on the building's appearance and are taken away when no longer needed. Bath, Clifton and many older village centres have more exceptions than most.

Listed Buildings and World Heritage

Listed buildings need listed building consent, and Bath is a World Heritage Site where much of the city is listed or protected. Councils tend to look more kindly on rear slopes, hidden valley roofs and outbuildings.

Conservation Areas

Bristol, Bath and many villages across the area have conservation areas. Inside one, panels facing a highway are more tightly controlled, and an Article 4 direction can remove permitted development rights for a defined area.

Flats, Flat Roofs and Ground Mounts

Rooftop solar on a block of flats can fall under permitted development with the freeholder's agreement. Panels on a flat roof must not stand more than 0.6 metres above the surface, and ground arrays carry their own limits.

Planning is handled by Bristol City Council, Bath and North East Somerset Council, South Gloucestershire Council or North Somerset Council, depending on where the property sits. The Planning Portal has general guidance. SolarGain checks planning constraints at survey, and your council can confirm whether a building is listed or in a designated area.

Areas Covered

Solar Panel Installation Areas Across Avon

SolarGain fits solar, batteries and car chargers throughout the four council areas of the old county, alongside the rest of our South West coverage. For more on the city itself, see our solar panels Bristol page.

Bristol and Bath

  • Bristol
  • Clifton
  • Bishopston
  • Bedminster
  • Fishponds
  • Bath
  • Widcombe
  • Combe Down
  • Keynsham
  • Midsomer Norton
  • Radstock

South Gloucestershire

  • Bradley Stoke
  • Filton
  • Patchway
  • Stoke Gifford
  • Emersons Green
  • Kingswood
  • Yate
  • Chipping Sodbury
  • Thornbury
  • Winterbourne

North Somerset

  • Weston-super-Mare
  • Clevedon
  • Portishead
  • Nailsea
  • Long Ashton
  • Backwell
  • Congresbury
  • Yatton

Customer Reviews

What SolarGain Customers Say

SolarGain holds a 5.0 rating on Google Reviews. Examples of finished installations are in our solar panel gallery.

“Phil Collins and his team have just installed our solar panels and battery system. We are very pleased with the professionalism, dedication, and teamwork that SolarGain has demonstrated. Phil is very knowledgeable and has kept us informed throughout the whole process.”
Paul ButcherGoogle Review
“Five stars for an exceptional, high-tech installation! Phil and Vanessa at SolarGain were absolutely brilliant from start to finish. Despite major external hold-ups, Phil and Vanessa kept me completely informed the entire time.”
DerekGoogle Review
“Cannot say anything other than positive about SolarGain, Phil, Vanessa and team. A brilliant installation and service from start to finish. I would massively recommend them if you are looking for solar energy.”
John IoizidesGoogle Review

FAQs

Solar Panels Avon FAQs

Avon no longer exists as a county. Who handles solar planning there?

The county of Avon was abolished in 1996 and replaced by four unitary authorities: Bristol City Council, Bath and North East Somerset Council, South Gloucestershire Council and North Somerset Council. Whichever council covers your address is the planning authority for any listed building consent or planning application. Most rooftop solar needs neither, because it falls under permitted development.

Can solar panels go on a house in Bath, a World Heritage Site?

Often, yes, though the approach is more careful than elsewhere. World Heritage status does not ban solar, but much of Bath is listed or within a conservation area, so panels are usually placed on rear slopes, valley roofs behind parapets or outbuildings out of public view. Listed homes need listed building consent from Bath and North East Somerset Council before work starts.

Do solar panels cope with coastal conditions in Weston-super-Mare and Clevedon?

Yes, with the right specification. Properties on the North Somerset coast face wind and salt off the Severn Estuary, so SolarGain uses panels tested for salt mist corrosion, stainless steel fixings and mounting kits certified for the calculated wind load. Arrays are kept back from roof edges, where wind suction is strongest.

Can landlords install solar panels on rented homes in Bristol or Bath?

Yes. The landlord owns and pays for the system, and tenants benefit from lower bills during the day. Solar can also help a property's Energy Performance Certificate rating. The landlord should tell tenants before the installation, agree access dates, and decide who receives any Smart Export Guarantee payments, which go to whoever holds the export tariff.

Do I need a smart meter for the Smart Export Guarantee?

In practice, yes. Suppliers paying the Smart Export Guarantee need to measure the electricity you export, and a smart meter records it half hourly. If you have an older meter, your supplier will usually arrange an upgrade when you apply. You also need the MCS certificate that SolarGain provides at handover.

Can one solar system use two roofs facing different directions?

Yes. Splitting panels across, for example, east and west slopes is common on Avon terraces and semis. Each roof face is wired to a separate inverter input, or fitted with optimisers, so the two orientations do not drag each other down. A split array produces more in the morning and late afternoon, which often suits households who are home at those times.

Next Step

Arrange Your Avon Solar Survey

Homes and businesses in Bristol, Bath, South Gloucestershire and North Somerset deal with one accredited family run team for design, consents advice, the NGED application, installation, MCS certification and ongoing support.

Phil visits in person to look at the roof, any shading and your electricity use before we prepare a quote, with no obligation to go ahead.

Call SolarGain on 0800 001 6258 or book a survey online.

Solar panels installed by SolarGain in the Avon area