• MCS Certified
  • TrustMark Approved
  • Which? Trusted Trader
  • Family Run

Solar Panels Devon

SolarGain installs solar panels in Devon for houses, farms, barns and workshops, from city streets in Exeter and Plymouth to market towns, coastal villages and detached properties out on the moor edge. Each system is designed around your roof, your electricity use and whether battery storage or EV charging is part of the plan.

Solar panels installed on a South West home by SolarGain
Covering Devon and the South West Installation dates usually available within three weeks.
  • Free, no-obligation solar survey
  • MCS certified and building-regulations compliant
  • TrustMark registered and Which? Trusted Trader
  • Family-run team led by Vanessa and Phil Collins
  • Network applications handled for you
  • Install dates usually within three weeks of acceptance
  • Tesla, EcoFlow, Sigenergy, FoxESS and Growatt
  • 0% VAT on domestic solar and battery storage

Why SolarGain

Three Reasons to Choose SolarGain

Accredited work with real consumer protection

SolarGain holds MCS certification and RECC registration, every installer is NAPIT accredited, and the company is assessed as a Which? Trusted Trader. Work carries a two year insurance-backed workmanship guarantee alongside the manufacturer product and performance warranties on panels, inverters and batteries. Deposits are protected under an IWA Deposit Guarantee.

Over 300 completed installations

SolarGain has completed more than 300 solar panel installations across the South West, covering domestic roofs, farm buildings and commercial premises. That range counts at survey stage, because a cob and slate cottage, a 1970s concrete tile semi and a modern trussed roof each call for a different mounting method and a different approach to weatherproofing.

One team, from design to aftercare

Survey, system design, network paperwork, installation, commissioning, MCS registration and aftercare are handled in house rather than passed to subcontractors. The same team that sizes the system fits it and sets up the monitoring. Installation dates are usually available within three weeks.

SolarGain is MCS certified, TrustMark approved and endorsed as a Which? Trusted Trader, NAPIT registered, RECC accredited and covered by the IWA Deposit Guarantee.

  • MCS Certified
  • TrustMark Approved
  • Which? Trusted Trader
  • NAPIT Registered
  • RECC Accredited
  • IWA Deposit Guarantee

Devon Solar PV

Solar Panel Installers in Devon

SolarGain designs, fits and commissions solar PV systems across Devon, from the Exe estuary and the East Devon coast through Mid Devon and the South Hams to the North Devon coast.

Devon receives more daylight than most of the country. The European Commission's Photovoltaic Geographical Information System puts Exeter at roughly 1,237 kilowatt-hours of solar irradiance per square metre each year, around 13 per cent above the UK average, which is one reason solar uptake in the county runs well ahead of the national figure. Higher irradiance does not make every roof worth doing, but it does mean a well-sited Devon array starts from a better position than the same array further north.

The building stock is where the real variation sits. A granite and slate cottage on the edge of Dartmoor, a rendered semi in Exeter, a Victorian terrace in Plymouth, a rendered bungalow above Exmouth and a steel-framed barn near South Molton have almost nothing in common structurally. Rafter spacing, roof covering, wind exposure and the state of the consumer unit all change what can be fitted and how it must be fixed, so every project starts with a technical survey rather than a package quote.

SolarGain fits roof-mounted arrays, ground-mounted systems and complete home energy systems combining solar, battery storage and EV charging. Completed work across the region is shown in our solar panel installation gallery.

MCS CertifiedRenewable technology installation
3 WeeksTypical installation availability
EX, TQ & PLDevon-wide coverage

Our Installation Services

Solar Panel Installation Services

Solar PV Installation

SolarGain designs and fits complete solar PV systems for Devon properties. The survey measures usable roof area, records pitch and orientation, runs a shade analysis and checks the roof covering and the rafters beneath it. Array layout, panel specification and inverter choice follow from that. Installation covers scaffolding, roof hooks, mounting rails, clamps, flashing, DC and AC cabling, isolators, earthing and bonding, then testing, commissioning and MCS registration.

Solar Battery Storage

A home battery stores generation the household does not use as it is produced, releasing it through the evening instead. SolarGain installs lithium iron phosphate storage from Tesla, EcoFlow, Sigenergy, FoxESS and Growatt, sized against daytime occupancy, evening demand and the tariff in use. Batteries can be scheduled to charge from cheaper off-peak electricity on a time-of-use tariff. Further detail is on the solar battery storage page.

Battery Retrofit for Existing Solar

Homeowners already generating solar electricity can add storage without touching the panels. Retrofit uses either an AC coupled battery alongside the existing inverter or a replacement hybrid inverter, and the choice depends on the age and capacity of the current equipment and the state of the consumer unit. The practicalities are covered in our guide to adding battery storage to existing solar panels.

EV Charger Installation

A home EV charger fitted alongside solar sends surplus generation to the car rather than the grid. Smart chargers, including Myenergi Zappi and Tesla units, read live generation through a CT clamp and match the charging rate to whatever the array is producing, then fall back to off-peak grid electricity overnight. Load balancing keeps total draw within the capacity of the incoming supply, which matters on rural Devon properties where the main fuse rating can be tight. Options are listed on our home EV chargers page.

Solar System Monitoring

Every system is connected to a monitoring app or portal at commissioning. It shows live generation, household consumption, battery state of charge and whether the property is importing or exporting, with daily, monthly and annual totals. That history makes a drop in output easy to spot and shows how much generation is being used on site.

Solar PV Upgrades and Extensions

SolarGain upgrades and extends existing solar systems, not only new ones. That covers replacing an ageing inverter, adding panels where roof space and inverter headroom allow, fitting power optimisers on partly shaded arrays, retrofitting bird protection mesh and improving monitoring on older installations. Any addition is checked against the existing array, inverter capacity and the original network approval before the work is quoted.

Suitability

Is Your Devon Home Suitable for Solar Panels?

Yes, most Devon homes can take solar panels, provided there is enough unshaded roof area, the roof structure is sound and the property uses enough electricity to make the generation worth having. Orientation matters less than people expect. South-facing roofs give the highest annual yield, but east and west slopes still perform well, and an east-west split array spreads output across the morning and late afternoon, which often suits a household better than a single midday peak.

Devon adds a few considerations that do not apply everywhere. Exposed coastal sites along the north coast and the Jurassic Coast need mounting components rated for higher wind loading and hardware chosen for corrosion resistance in salt-laden air. Older cob, stone and slate properties inland need the roof structure checked before anything is fixed to it.

Solar panels installed across the roofs of a South West housing development
East and west roofs work too A survey confirms what your specific roof can deliver.

During a solar panel survey, SolarGain assesses:

  • Usable roof area and the capacity of the rafters beneath it
  • Roof pitch, orientation and the shape of the available slopes
  • Roof covering, including slate, concrete and clay tile, and flat roof membranes
  • Shading from chimneys, dormers, mature trees and neighbouring buildings
  • Wind exposure and corrosion risk on coastal and elevated sites
  • Current electricity use and future demand from a heat pump or electric car
  • Consumer unit capacity, earthing arrangements and cable routes
  • Local network capacity and any limit on what can be exported
  • Listed building, conservation area or national park considerations

Not every property is suitable. A small north-facing roof shaded for most of the day, or a roof covering at the end of its life, may be better left until other work is done. Homes with a heat pump or an electric car draw far more electricity than the bills alone suggest, so expected future demand is built into the design rather than sizing purely on last year's usage.

The Process

How Are Solar Panels Installed?

Solar panels are installed by surveying the property, designing the array, fixing a mounting system to the roof structure, fitting and wiring the panels, connecting the inverter and commissioning the finished system.

Every stage is handled by SolarGain so the installation meets BS 7671 and building regulations. Our guide to how solar panels are installed goes further into fixing methods and system components.

  1. Survey and Design We review your electricity bills, measure the roof, run a shade analysis and check the structure, then specify panels, inverter and battery against the demand the household actually has.
  2. Network Applications SolarGain submits the G98 notification or the G99 application to National Grid Electricity Distribution, the network operator for Devon, on your behalf.
  3. Roof Preparation Scaffolding goes up, then stainless roof hooks are fixed into the rafters and aluminium rails and flashing kits are fitted, so no load bears directly on the tiles or slates.
  4. Panel Mounting Modules are clamped to the rails and connected with weatherproof DC cabling, fire-rated isolators and surge protection.
  5. Electrical Work Our electricians install the inverter, any battery and the AC isolators, wiring them into the consumer unit on a dedicated circuit with the correct earthing and bonding.
  6. Testing and Handover The system is tested and commissioned, registered under MCS and with TrustMark, connected to monitoring, and handed over with the electrical certificate and full documentation.
Tesla Powerwall solar battery storage installed in the South West

Solar Plus Storage

How Do Solar Panels and Batteries Work Together?

Solar panels generate electricity during daylight hours, and a home battery stores whatever the household does not use at the time so it can be drawn on later. Appliances take the generation first, the surplus charges the battery rather than going straight to the grid, and once the battery is full the remainder is exported.

Through the evening the battery discharges to run lighting, cooking, the television and any overnight load, which is when a household would otherwise be buying electricity at the highest rate. On a time-of-use tariff the battery can also be scheduled to charge from cheap off-peak grid electricity overnight and cover the following morning, and exported units can earn payments through the Smart Export Guarantee.

A battery is not automatically a backup supply. Keeping selected circuits running during a power cut needs equipment with that capability and a changeover arrangement wired in at installation, so it is worth raising at survey if it matters to you. Systems can also divert surplus to an immersion heater or an EV charger before anything is exported.

  • Tesla
  • EcoFlow
  • Sigenergy
  • FoxESS
  • Growatt

Expected Output

How Much Electricity Can Solar Panels Generate in Devon?

The amount of electricity a solar system generates depends mainly on its kWp rating, the orientation and pitch of the roof, how much shading falls across it and the solar irradiance at that location. Devon sits among the sunnier parts of the United Kingdom, and a well-sited array in the county generally produces in the region of 950 to 1,100 kilowatt-hours a year for every kWp installed.

That range is wide for a reason. A south-facing slope at around 35 degrees with no shading sits near the top of it, an east-west split array a little below, and a roof clipped by a chimney or a mature tree for part of the day lower again. Output is highest between April and September and falls back through the winter, when panels keep working on diffuse daylight but produce a fraction of the summer figure. Panels lose a small percentage of output each year as they age, which is covered by the manufacturer performance warranty.

950–1,100 kWhTypical annual output per kWp installed in Devon
1,237 kWh/m²Annual solar irradiance recorded for Exeter by the European Commission's PVGIS tool
Site specificYour survey produces a generation estimate for your own roof
EcoFlow battery storage installed at a home in Taunton, Somerset

South West Installation Case Study

10.87kWp Solar PV in Taunton, Somerset

SolarGain designed and fitted a 10.87kWp array on a slate roof in Taunton, paired with battery storage and app monitoring. It is a Somerset installation rather than a Devon one, but the mounting approach and the slate detailing translate directly to the many slate roofs across Devon. Full details are on the 10.87kW Taunton case study page.

Grid Connection

What Are DNO, G98 and G99 Requirements?

DNO, G98 and G99 requirements govern how a solar system connects to the local electricity network, and SolarGain handles that paperwork as part of the job.

The DNO, or Distribution Network Operator, owns and runs the local power lines and substations, and for Devon that is National Grid Electricity Distribution. Systems with an inverter output up to 3.68kW on a single-phase supply follow the G98 route, where the installer notifies the operator within 28 days of commissioning.

Larger systems, including most solar and battery combinations, need a G99 application approved before installation. Where local network capacity is constrained, which is more common on rural feeders, the operator may grant approval with an export limit. An export limit caps what can be sent to the grid, not what the household can generate and use on site.

Certification

What Are MCS Requirements?

MCS is the certification scheme covering microgeneration products and installers, and it confirms an installation meets recognised technical standards.

An MCS certificate is the document an energy supplier asks for before accepting a Smart Export Guarantee application, so it bears directly on what a household can be paid for exported electricity. Standards and scheme detail are published by MCS.

Every SolarGain installation is certified under MCS and supplied with full handover documentation, alongside the electrical installation certificate issued under BS 7671.

Planning

Do You Need Planning Permission for Solar Panels in Devon?

No, planning permission is not needed for most domestic rooftop solar installations in Devon, because they fall under permitted development.

The conditions are that panels do not protrude more than 200 millimetres from the roof slope, are sited to reduce their effect on the appearance of the building, and are removed when no longer needed. Several situations sit outside permitted development, and Devon has more of them than most counties.

Listed Buildings

Listed buildings require listed building consent, assessed on how the installation affects the character and fabric of the property. Rear roof slopes and discreet ground-mounted systems are often looked on more favourably. Devon has a large stock of older cob, stone and thatched properties, so this comes up more often here than in areas of mainly modern housing.

National Parks and Protected Landscapes

Dartmoor and Exmoor are national parks with their own planning authorities, and permitted development rights are more restricted inside their boundaries. Parts of Devon also sit within nationally protected landscapes, including the North Devon Coast, the Tamar Valley, the Blackdown Hills and the East Devon area covering the Jurassic Coast.

Flat Roofs and Ground Mounts

Panels on flat roofs must not stand more than 0.6 metres above the roof surface under standard permitted development conditions. Ground-mounted arrays and solar carports carry their own size and siting limits, and a conservation area or Article 4 direction can remove permitted development rights altogether.

Devon is covered by more than one planning authority, so the right place to check depends on where the property sits. East Devon, Mid Devon, North Devon, South Hams, Teignbridge, Torridge and West Devon each have their own district council, Exeter has a city council, and Plymouth and Torbay are unitary authorities. Dartmoor and Exmoor National Park Authorities handle planning inside the parks. General guidance is on the Planning Portal, and Devon County Council can point you to the right authority. SolarGain reviews planning constraints during your survey, but whether a specific property is listed or falls within a designated area should be confirmed with the relevant authority.

Areas Covered

Solar Panel Installation Areas Across Devon

SolarGain installs across Devon, working out from the M5 and A30 corridors into East Devon, Mid Devon, the Teignbridge and Torbay coast, the South Hams, Plymouth and West Devon, and up to the North Devon coast.

Geography changes the job as much as distance does. Grid capacity varies between substations, which affects what the network operator will approve for export, and rural feeders are more often constrained than urban ones. Access matters too, since scaffolding and delivery are straightforward on a modern estate and considerably less so down a narrow Devon lane. Every property is surveyed individually for those reasons.

  • Exeter and the surrounding villages
    EX1 – EX6
  • Exmouth, Sidmouth and the East Devon coast
    EX8 – EX10
  • Honiton, Axminster and Seaton
    EX12 – EX14
  • Tiverton, Cullompton and Mid Devon
    EX15 & EX16
  • Crediton and the Exe valley
    EX17
  • Newton Abbot, Teignmouth and Dawlish
    TQ12 & TQ14
  • Torquay, Paignton and Brixham
    TQ1 – TQ5
  • Totnes, Kingsbridge and the South Hams
    TQ7 & TQ9
  • Plymouth, Ivybridge and Tavistock
    PL1 – PL21
  • Okehampton and West Devon
    EX20
  • Barnstaple, Bideford and Ilfracombe
    EX31 – EX39
  • South Molton and Great Torrington
    EX36 & EX38

Reviews

Customer Reviews and Installation Evidence

SolarGain holds a 5.0 rating from Google reviews, and the work behind it is visible in completed installations across the South West. More completed projects are shown in our solar panel installation gallery.

Verified Google customer reviews
PB
Paul Butcher
1 week ago

Phil Collins and his team have just installed our solar panels and battery system. We are very pleased with the professionalism, dedication, and teamwork that SolarGain has demonstrated. Phil is very knowledgeable and has kept us informed throughout the whole process. We couldn't be happier with the quality of the installation; these guys come highly recommended, and we will be recommending them to friends and family.

D
Derek
1 month ago

Five stars for an exceptional, high-tech installation! Phil and Vanessa at SolarGain were absolutely brilliant from start to finish. The installation wasn't completely without its flaws, but how they handled it proved just how professional they are. The delivery driver/dispatcher for the panels ran into issues getting them off the lorry and didn't return for 26 hours. Despite these major external hold-ups, Phil and Vanessa kept me completely informed the entire time. They even sent a really nice hamper to apologize for the delays, even though it wasn't their fault at all!

JI
John Ioizides
1 month ago

Cannot say anything other than positive about SolarGain Phil, Vanessa and team. A brilliant installation and service from start to finish. I would massively recommend them if you are looking for solar energy. Thank you.

Questions

Solar Panels Devon FAQs

Do I need permission from my mortgage lender or freeholder before fitting solar panels?

No, you do not normally need your mortgage lender's permission to fit solar panels to a freehold home you own, because the panels become part of the property rather than a separate interest in it. Leaseholders are in a different position and usually do need the freeholder's consent, since the roof is often retained by the freeholder rather than included in the lease. Where a restrictive covenant applies to the property, or the system is being financed under an arrangement that places a charge on the house, the paperwork is worth checking and the lender worth telling before anything is signed.

How do I compare two solar quotes that look similar?

Compare the kWp rating, the panel and inverter specification, the usable battery capacity and the length and backing of the workmanship guarantee, because two quotations at the same price can contain very different equipment. A quotation should state the number of panels and their wattage, the resulting system size, the inverter model, the usable rather than nameplate battery capacity, whether scaffolding is included and what annual generation is expected. Ask whether the generation estimate follows MCS methodology, since a figure produced another way is not directly comparable. Check that the installer is MCS certified, registered with a consumer code such as RECC, and that the workmanship guarantee is insurance backed.

Can solar panels be fitted to a thatched roof?

No, solar panels are not fitted to thatch itself, because fixings cannot be anchored into it safely and the fire risk is not acceptable. Devon has a considerable number of thatched properties, and the usual route on those homes is a ground-mounted array in a garden or paddock, or panels on a garage, barn or outbuilding with a conventional roof covering, with the generation cabled back to the house. Thatched properties are often listed, so listed building consent may still be needed even for a ground-mounted system set away from the building.

How exposed is too exposed for a coastal property?

There is no fixed cut-off, because wind loading is calculated for the individual site rather than judged by how exposed it looks. The calculation takes account of the height of the building, the surrounding terrain, the distance from the sea and where the panels sit on the roof, and the result sets the rail spacing, the number of roof hooks and the clamping arrangement. Coastal sites also need hardware selected for salt-laden air, which means stainless fixings and suitably coated framing. On severely exposed plots the right answer is sometimes a smaller array, or one moved to a more sheltered slope, rather than simply adding more fixings.

Can I run my home entirely on solar power?

No, a normal domestic solar and battery system will not run a home entirely on its own through a British winter, because generation between November and February is a small fraction of the summer figure. What a well-sized system does is cover a large share of annual electricity use, with much of the summer met on site and grid imports concentrated in the darker months. Running genuinely off grid needs a far larger array, considerably more storage and usually a generator, which rarely makes financial sense at a property that already has a mains connection.

What happens to my warranties if the installer stops trading?

Manufacturer warranties stay with the equipment, because they are given by the panel, inverter and battery makers rather than by the installer. The part at risk is the workmanship guarantee, which is why an insurance-backed guarantee counts: the cover is underwritten by an insurer and continues if the installing company ceases to trade. TrustMark registration and membership of a consumer code such as RECC also provide a route for complaints and dispute resolution. Ask any installer who underwrites their guarantee and for how long it runs.

Does having solar panels change my EPC rating?

Yes, solar panels normally improve an EPC rating, because the assessment gives credit for electricity generated on site. How much the rating moves depends on the size of the array relative to the property and on what else the assessment picks up, so panels alone do not always shift a home into a higher band. The certificate does not update by itself, so a new assessment has to be arranged after the system is commissioned if the rating matters for a sale or a letting.

Can I take the solar panels with me if I move house?

No, solar panels are not usually removed when you move, because they are fixed to the roof and treated as part of the property. Taking an array down means removing the panels and mounting system, making good every roof penetration and undoing the electrical work, which generally costs more than the equipment is worth second hand. The system transfers with the house, so the MCS certificate, electrical certification and any remaining warranties should be passed to the buyer. A Smart Export Guarantee tariff is tied to the energy account rather than the building, so the new owner applies in their own name.

What is Solar Together Devon?

Solar Together Devon is a group-buying scheme run with Devon County Council, in which households register their interest and installers bid to supply the whole group at a set price. Registration is free and there is no obligation to accept the offer that comes back. The trade-off is that the specification and the installer are decided by the auction rather than chosen by the homeowner, which suits a straightforward roof and a standard package better than an unusual property or a particular piece of equipment. Current details are published by Devon County Council.

What happens if the network operator will not approve the system size I want?

The usual outcome is approval with an export limit rather than a flat refusal, which caps how much electricity can be sent to the grid while leaving generation and on-site use untouched. Where the local network is constrained, and rural feeders more often are, the operator can require an export limitation device or set the limit to zero so the system runs for self-consumption only. Battery storage becomes more valuable in that situation, because generation that cannot be exported can be stored and used in the evening instead. If the constraint is severe, the options are a smaller inverter, a reinforcement quotation from the operator or a redesign, and SolarGain raises this at design stage rather than once the panels are on the roof.

Next Step

Arrange Your Devon Solar Survey

SolarGain fits solar panels in Devon for homes, farms and businesses, handling design, network applications, installation, MCS certification and aftercare with one accredited team.

A survey assesses the roof, the shading and your electricity use before any quotation is prepared, and there is no obligation to proceed.

Call 0800 001 6258 or request a survey online.

Solar panels installed on a South West home by SolarGain