• MCS Certified
  • TrustMark Approved
  • Which? Trusted Trader
  • Family Run

Solar Panels Exeter

SolarGain installs solar panels in Exeter and the surrounding Devon communities, from Victorian terraces in St Thomas and Heavitree to 1930s semis, modern estates on the eastern edge of the city and detached homes out towards Broadclyst and Topsham. Every solar PV system is designed around your roof, your electricity use and whether battery storage or EV charging forms part of it.

Solar panels installed on a South West home by SolarGain
Covering EX1 to EX6 and beyond Installation dates usually available within three weeks.
  • Free, no-obligation solar survey
  • MCS certified and building-regulations compliant
  • TrustMark registered and Which? Trusted Trader
  • Family-run team led by Vanessa and Phil Collins
  • Network applications handled for you
  • Install dates usually within three weeks of acceptance
  • Tesla, EcoFlow, Sigenergy, FoxESS and Growatt
  • 0% VAT on domestic solar and battery storage

Why SolarGain

Three Reasons to Choose SolarGain

Accredited work with real consumer protection

SolarGain holds MCS certification and RECC registration, every installer is NAPIT accredited, and the company is assessed as a Which? Trusted Trader. Work carries a two year insurance-backed workmanship guarantee alongside the manufacturer product and performance warranties on panels, inverters and batteries. Deposits are protected under an IWA Deposit Guarantee.

Over 300 completed installations

SolarGain has completed more than 300 solar panel installations across the South West, on domestic roofs, farm buildings and commercial premises. Terraced city housing is a different job from a detached property with open roof space, and having done both is what decides the mounting method, the array layout and how the scaffold is set out.

One team, from design to aftercare

Survey, system design, network paperwork, installation, commissioning, MCS registration and aftercare are handled in house rather than passed to subcontractors. The same team that sizes the system fits it and sets up the monitoring. Installation dates are usually available within three weeks.

SolarGain is MCS certified, TrustMark approved and endorsed as a Which? Trusted Trader, NAPIT registered, RECC accredited and covered by the IWA Deposit Guarantee.

  • MCS Certified
  • TrustMark Approved
  • Which? Trusted Trader
  • NAPIT Registered
  • RECC Accredited
  • IWA Deposit Guarantee

Exeter Solar PV

Solar Panel Installers in Exeter

SolarGain designs, fits and commissions solar PV systems across Exeter, working on city terraces, suburban semis, new-build estates and the detached properties on the edge of the city.

Exeter sits in one of the sunnier parts of the country. The European Commission's Photovoltaic Geographical Information System records roughly 1,237 kilowatt-hours of solar irradiance per square metre a year for the city, around 13 per cent above the UK average. Good irradiance improves what any given roof returns, though it does not make a small shaded roof worth doing.

The housing is what really varies. Victorian and Edwardian terraces through St Thomas, Newtown and Heavitree carry slate on relatively steep pitches, with chimney stacks breaking up the available area and narrow rear access. Interwar semis around Pennsylvania, Whipton and Pinhoe tend to offer clean unbroken slopes on concrete tile. Newer estates on the eastern side of the city and at Cranbrook are built on modern trusses, often with a favourable orientation designed in. Each of those calls for different fixings, a different array layout and a different approach to getting the scaffold up.

SolarGain fits roof-mounted arrays and complete home energy systems combining solar, battery storage and EV charging. Completed work across the region is shown in our solar panel installation gallery.

MCS CertifiedRenewable technology installation
3 WeeksTypical installation availability
EX1 – EX6Exeter and surrounding parishes

Our Installation Services

Solar Panel Installation Services

Solar PV Installation

SolarGain designs and fits complete solar PV systems for Exeter properties. The survey measures usable roof area, records pitch and orientation, runs a shade analysis and checks the roof covering and the rafters beneath it. Array layout, panel specification and inverter choice follow from that. Installation covers scaffolding, roof hooks, mounting rails, clamps, flashing, DC and AC cabling, isolators, earthing and bonding, then testing, commissioning and MCS registration.

Solar Battery Storage

A home battery stores generation the household does not use as it is produced, releasing it through the evening instead. SolarGain installs lithium iron phosphate storage from Tesla, EcoFlow, Sigenergy, FoxESS and Growatt, sized against daytime occupancy, evening demand and the tariff in use. Batteries can be scheduled to charge from cheaper off-peak electricity on a time-of-use tariff. Further detail is on the solar battery storage page.

Battery Retrofit for Existing Solar

Homeowners already generating solar electricity can add storage without touching the panels. Retrofit uses either an AC coupled battery alongside the existing inverter or a replacement hybrid inverter, and the choice depends on the age and capacity of the current equipment and the state of the consumer unit. The practicalities are covered in our guide to adding battery storage to existing solar panels.

EV Charger Installation

A home EV charger fitted alongside solar sends surplus generation to the car rather than the grid. Smart chargers, including Myenergi Zappi and Tesla units, read live generation through a CT clamp and match the charging rate to whatever the array is producing, then fall back to off-peak grid electricity overnight. Load balancing keeps total draw within the capacity of the incoming supply, which matters on older Exeter properties where the main fuse rating can be tight. Options are listed on our home EV chargers page.

Solar System Monitoring

Every system is connected to a monitoring app or portal at commissioning. It shows live generation, household consumption, battery state of charge and whether the property is importing or exporting, with daily, monthly and annual totals. That history makes a drop in output easy to spot and shows how much generation is being used on site.

Solar PV Upgrades and Extensions

SolarGain upgrades and extends existing solar systems, not only new ones. That covers replacing an ageing inverter, adding panels where roof space and inverter headroom allow, fitting power optimisers on partly shaded arrays, retrofitting bird protection mesh and improving monitoring on older installations. Any addition is checked against the existing array, inverter capacity and the original network approval before the work is quoted.

Suitability

Is Your Exeter Home Suitable for Solar Panels?

Yes, most Exeter homes can take solar panels, provided there is enough unshaded roof area, the roof structure is sound and the household uses enough electricity for the generation to be worth having. Orientation matters less than people expect. A south-facing slope gives the highest annual yield, but east and west slopes still perform well, and splitting an array across both spreads output over the morning and late afternoon rather than concentrating it at midday.

City housing brings its own limits. A mid-terrace roof is narrow to begin with, and a chimney stack, a dormer or a rooflight can remove a surprising amount of the usable area, which is why the survey measures what is actually available rather than the whole slope. Neighbouring buildings and mature street trees cast shade that changes through the day and the year, so the shade analysis matters more here than on an open site.

Solar panels installed across the roofs of a South West housing development
East and west roofs work too A survey confirms what your specific roof can deliver.

During a solar panel survey, SolarGain assesses:

  • Usable roof area once chimneys, dormers and rooflights are taken out
  • Roof pitch, azimuth and the tilt angle each slope presents
  • Roof covering, whether slate, concrete tile, clay tile or a flat roof membrane
  • Rafter spacing and the structure carrying the covering
  • Shading from neighbouring buildings, chimney stacks and mature trees
  • Scaffold access, which is tighter on terraced streets than on open plots
  • Current electricity use and demand from a heat pump or electric car
  • Consumer unit capacity, earthing arrangements and cable routes
  • Listed building or conservation-area status where it applies

Not every property is suitable. A small north-facing roof in shade for most of the day, or a covering close to the end of its life, is often better left until other work is done. Where a household is adding a heat pump or an electric car, the design is sized against that expected demand rather than last year's bills alone.

The Process

How Are Solar Panels Installed?

Solar panels are installed by surveying the property, designing the array, fixing a mounting system to the roof structure, fitting and wiring the panels, connecting the inverter and commissioning the finished system.

Every stage is handled by SolarGain so the installation meets BS 7671 and building regulations. Our guide to how solar panels are installed goes further into fixing methods and system components.

  1. Survey and Design We review your electricity bills, measure the roof, run a shade analysis and check the structure, then specify panels, inverter and battery against the demand the household actually has.
  2. Network Applications SolarGain submits the G98 notification or the G99 application to National Grid Electricity Distribution, the network operator for Exeter and the wider South West, on your behalf.
  3. Roof Preparation Scaffolding goes up, then stainless roof hooks are fixed into the rafters and aluminium rails and flashing kits are fitted, so no load bears directly on the tiles or slates.
  4. Panel Mounting Modules are clamped to the rails and connected with weatherproof DC cabling, fire-rated isolators and surge protection.
  5. Electrical Work Our electricians install the inverter, any battery and the AC isolators, wiring them into the consumer unit on a dedicated circuit with the correct earthing and bonding.
  6. Testing and Handover The system is tested and commissioned, registered under MCS and with TrustMark, connected to monitoring, and handed over with the electrical certificate and full documentation.
Tesla Powerwall solar battery storage installed in the South West

Solar Plus Storage

How Do Solar Panels and Batteries Work Together?

Solar panels generate electricity during daylight hours, and a home battery stores whatever the household does not use at the time so it can be drawn on later. Appliances draw on the generation as it is produced, the surplus charges the battery rather than going straight to the grid, and once the battery is full the remainder is exported.

Through the evening the battery discharges to run lighting, cooking, the television and any overnight load, which is when a household would otherwise be buying electricity at the highest rate. On a time-of-use tariff the battery can also be scheduled to charge from cheap off-peak grid electricity overnight and cover the following morning, and exported units can earn payments through the Smart Export Guarantee.

A battery is not automatically a backup supply. Keeping selected circuits running during a power cut needs equipment with that capability and a changeover arrangement wired in at installation, so it is worth raising at survey if it matters to you. Systems can also divert surplus to an immersion heater or an EV charger before anything is exported.

  • Tesla
  • EcoFlow
  • Sigenergy
  • FoxESS
  • Growatt

Costs

How Much Do Solar Panels Cost in Exeter?

The cost of solar panels in Exeter depends on the size of the system in kWp, the roof layout and covering, the equipment specified, how the property is accessed and whether battery storage or EV charging is included. A straightforward array on a single tiled slope sits at one end of the range and a multi-elevation array with high-capacity storage and a charger at the other.

What moves the figure on a quotation:

  • Number and watt-peak rating of the panels, and the resulting kWp
  • Inverter type, whether a string inverter, hybrid inverter or panel-level electronics
  • Battery chemistry and usable capacity in kWh
  • Scaffold height and access, which is more involved on a terraced street than a driveway
  • Number of roof elevations, since splitting an array across two or three slopes adds cabling and complexity
  • Slate hooks, in-roof trays or other specialist fixings
  • Consumer unit upgrades, surge protection, earthing and cable run lengths
  • Bird protection mesh and any EV charger integration

SolarGain issues a fixed written quotation after the survey rather than an estimate over the phone, so the figure reflects your roof rather than a national average. Finance is available through Hometree solar finance.

Tax Relief

0% VAT on domestic solar and battery storage

Residential solar panels and home battery systems currently benefit from 0% VAT under the government's energy-saving materials relief, which reduces the upfront cost of a qualifying installation.

0%VAT on qualifying work
FixedQuotation after survey

Expected Output

How Much Electricity Can Solar Panels Generate in Exeter?

The amount of electricity a solar system generates depends mainly on its kWp rating, the azimuth and tilt of the roof, how much shading falls across it and the solar irradiance at that location. Exeter is among the better-placed cities in the country on irradiance, and a well-sited array here generally produces in the region of 950 to 1,100 kilowatt-hours a year for every kWp installed.

That is a wide range for a reason. A clear south-facing slope near 35 degrees sits at the top of it, an east-west split array a little below, and a roof clipped by a chimney stack or a neighbouring building for part of the day lower again. Output peaks between April and September and drops back through the winter, when panels keep working on diffuse daylight at a fraction of the summer figure. Warm weather slightly reduces panel efficiency through the temperature coefficient, and modules lose a small percentage of output each year, which the manufacturer performance warranty covers.

950–1,100 kWhTypical annual output per kWp installed
1,237 kWh/m²Annual solar irradiance recorded for Exeter by the European Commission's PVGIS tool
Site specificYour survey produces a generation estimate for your own roof
EcoFlow battery storage installed at a home in Taunton, Somerset

South West Installation Case Study

10.87kWp Solar PV in Taunton, Somerset

SolarGain designed and fitted a 10.87kWp array on a slate roof in Taunton, paired with battery storage and app monitoring. It is a Somerset installation rather than an Exeter one, though the slate detailing and the mounting method apply directly to the slate roofs common across older Exeter housing. Full details are on the 10.87kW Taunton case study page.

Grid Connection

What Are DNO, G98 and G99 Requirements?

DNO, G98 and G99 requirements govern how a solar system connects to the local electricity network, and SolarGain handles that paperwork as part of the job.

The DNO, or Distribution Network Operator, owns and runs the local power lines and substations, and for Exeter that is National Grid Electricity Distribution. Systems with an inverter output up to 3.68kW on a single-phase supply follow the G98 route, where the installer notifies the operator within 28 days of commissioning.

Larger systems, including most solar and battery combinations, need a G99 application approved before installation. Where local network capacity is constrained, which is more common on rural feeders, the operator may grant approval with an export limit. An export limit caps what can be sent to the grid, not what the household can generate and use on site.

Certification

What Are MCS Requirements?

MCS is the certification scheme covering microgeneration products and installers, and it confirms an installation meets recognised technical standards.

An MCS certificate is the document an energy supplier asks for before accepting a Smart Export Guarantee application, so it bears directly on what a household can be paid for exported electricity. Standards and scheme detail are published by MCS.

Every SolarGain installation is certified under MCS and supplied with full handover documentation, alongside the electrical installation certificate issued under BS 7671.

Planning

Do You Need Planning Permission for Solar Panels in Exeter?

No, planning permission is not needed for most domestic rooftop solar installations in Exeter, because they fall under permitted development.

The conditions are that panels project no more than 200 millimetres from the roof slope, are positioned to reduce their effect on the appearance of the building, and are removed once no longer needed. A city with a great deal of older housing has more exceptions than most.

Listed Buildings

Listed buildings need listed building consent, judged on how an installation affects the character and fabric of the property. A rear slope out of public view is generally received more favourably than a front elevation.

Conservation Areas and Article 4

Exeter City Council designates conservation areas across the city and holds the register of them. Inside one, panels on a roof slope facing a highway face tighter control, and an Article 4 direction can remove permitted development rights entirely for a defined area.

Flat Roofs and Ground Mounts

Panels on a flat roof must not stand more than 0.6 metres above the roof surface under standard permitted development conditions. Ground-mounted arrays and solar canopies carry their own size and siting limits.

Exeter City Council is the local planning authority for the city and holds the records of listed buildings, conservation areas and any Article 4 directions. Properties outside the city boundary fall to East Devon, Mid Devon or Teignbridge depending on where they sit. General guidance is published on the Planning Portal. SolarGain reviews planning constraints during your survey, though whether a specific property is listed or falls inside a designated area should be confirmed with the council.

Areas Covered

Solar Panel Installation Areas Around Exeter

SolarGain installs across Exeter and the parishes around it, and covers the wider county from the same base. Our solar panels Devon page sets out the county-wide picture.

Location changes the practicalities more than the design. Grid capacity differs between substations, which affects what the network operator will approve for export, and access differs sharply between a suburban driveway and a terraced street where the scaffold has to go up from the pavement. Every property is surveyed individually for that reason.

  • Exeter city centre, Newtown and St Leonard's
    EX1 & EX2
  • Heavitree, Whipton and Wonford
    EX1 & EX2
  • St Thomas, Exwick and Cowick
    EX4
  • Pennsylvania, Stoke Hill and Pinhoe
    EX4 & EX1
  • Alphington, Marsh Barton and Countess Wear
    EX2
  • Topsham and the Exe estuary villages
    EX3
  • Broadclyst, Cranbrook and Clyst St Mary
    EX5
  • Exminster, Kenton and the A379
    EX6
  • Crediton and the Exe valley
    EX17
  • Exmouth and the East Devon coast
    EX8

Reviews

Customer Reviews and Installation Evidence

SolarGain holds a 5.0 rating from Google reviews, and the work behind it is visible in completed installations across the South West. The fully documented example above is the 10.87kWp slate roof system in Taunton, which is a Somerset installation rather than an Exeter one, though the slate detailing and mounting method apply directly to the slate roofs common across older Exeter housing. More completed projects are shown in our solar panel installation gallery.

[Insert verified SolarGain customer review from an Exeter installation]

Verified Google customer reviews
PB
Paul Butcher
1 week ago

Phil Collins and his team have just installed our solar panels and battery system. We are very pleased with the professionalism, dedication, and teamwork that SolarGain has demonstrated. Phil is very knowledgeable and has kept us informed throughout the whole process. We couldn't be happier with the quality of the installation; these guys come highly recommended, and we will be recommending them to friends and family.

D
Derek
1 month ago

Five stars for an exceptional, high-tech installation! Phil and Vanessa at SolarGain were absolutely brilliant from start to finish. The installation wasn't completely without its flaws, but how they handled it proved just how professional they are. The delivery driver/dispatcher for the panels ran into issues getting them off the lorry and didn't return for 26 hours. Despite these major external hold-ups, Phil and Vanessa kept me completely informed the entire time. They even sent a really nice hamper to apologize for the delays, even though it wasn't their fault at all!

JI
John Ioizides
1 month ago

Cannot say anything other than positive about SolarGain Phil, Vanessa and team. A brilliant installation and service from start to finish. I would massively recommend them if you are looking for solar energy. Thank you.

Questions

Solar Panels Exeter FAQs

Do I need my neighbours' agreement to put scaffolding up for a terraced house?

You need their permission only if the scaffold has to stand on their land, which on a terraced street it often does at the rear. Where the scaffold sits entirely on your own property or on the public pavement, the arrangement is between us, you and the council, and a pavement licence is obtained where one is required. Speaking to the neighbour early tends to be the difference between a straightforward week and a delayed one, so we identify at survey whether access over an adjoining property is needed rather than discovering it on the morning.

Do solar panels need building regulations approval?

Yes, solar panels are subject to building regulations even where planning permission is not required, because the work affects both the structure and the electrical installation. The roof has to be able to carry the additional load, the fixings must be weathertight, and the electrical work falls under Part P and BS 7671. An MCS certified installer notifies the work through a competent person scheme, so a separate application to building control is not usually needed. Where a roof is marginal structurally, a structural report may be required before anything is fitted.

Does the Smart Export Guarantee require a south-facing roof?

No, the Smart Export Guarantee has no requirement about which way a roof faces, because it pays for units exported to the grid regardless of where they came from. What it does require is an MCS certificate for the installation and an export-capable meter, usually a smart meter, so the supplier can measure what leaves the property. An east or west facing array simply exports at different times of day than a south-facing one. Our Smart Export Guarantee guide covers how the tariffs work.

Can I have solar panels fitted if I rent the property out?

Yes, a landlord can have solar panels fitted, because consent rests with the owner rather than the tenant. The practical questions are who benefits and who pays: the tenant sees the reduction in imported electricity, while the export payments follow whoever holds the energy account. Tenants need reasonable notice and access for the survey and the installation. A system also tends to improve the EPC rating, which matters to landlords under the minimum energy efficiency standards.

Can solar panels be fitted to a house with a loft conversion?

Yes, in most cases, though the conversion changes what the survey has to check. Roof lights and dormers take usable area out of the slope and break it into smaller sections, which affects how many panels fit and how the strings are arranged. The structure matters too, since a converted roof may have had rafters strengthened, purlins removed or steels added, and the mounting has to fix into something that can carry the load. Access to the underside for the cable route is often more restricted once a loft is a finished room, so the route is planned at survey.

Will solar panels interfere with my television or broadband?

No, a correctly installed solar system should not interfere with television or broadband reception, because inverters sold in the UK have to meet electromagnetic compatibility requirements. Interference does occasionally appear, and where it does the cause is usually a faulty component, poor earthing or DC cabling run alongside an aerial or coaxial cable rather than the inverter itself. Keeping DC runs separated from aerial cabling and bonding the array correctly avoids it. Where a rooftop aerial or satellite dish sits on the same slope, the array is laid out to keep clear of it.

Do I need to tell my energy supplier before or after the installation?

After, in most cases, because the supplier is involved at the point you apply for an export tariff rather than at installation. The network operator, which is a different organisation from your supplier, is notified before or shortly after the work depending on the system size, and SolarGain handles that. Once the system is commissioned and the MCS certificate is issued, you apply to a supplier for a Smart Export Guarantee tariff, and you do not have to use your existing supplier for it. If your meter is not export capable, the supplier arranges the exchange.

Can a home battery be charged from cheap overnight electricity without any solar panels?

Yes, a battery can be installed and run on its own, charging from the grid overnight on a time-of-use tariff and discharging through the expensive part of the day. The saving comes from the difference between the off-peak and peak rates rather than from generation, so it depends entirely on being on a tariff with a genuine price spread. A battery-only installation still needs a network application and the same electrical work as one paired with solar. Panels can be added later if the inverter has been specified with that in mind.

Is it worth fitting solar before or after a planned extension?

After, if the extension affects the roof, and before if it does not. Building an extension that changes the roofline, adds a new slope or casts shade onto the existing one after the panels are up can mean taking part of the array down and refitting it, which costs money twice. An extension also changes household electricity use and may involve a new consumer unit, both of which feed into how the system is sized. Where the extension is at the other end of the property and the roof is untouched, there is no reason to wait.

How long does the network operator application take?

A G98 notification is submitted within 28 days of commissioning, so it does not hold anything up, while a G99 application has to be approved before installation and typically takes several weeks. The exact time depends on the operator's workload and on whether the local network has capacity, and a constrained area can take longer or come back with an export limit attached. SolarGain submits the application as soon as the design is settled, so it runs in parallel with ordering and scheduling rather than starting afterwards.

Next Step

Arrange Your Exeter Solar Survey

SolarGain fits solar panels in Exeter for homes and businesses across the city and the surrounding Devon parishes, handling design, network applications, installation, MCS certification and aftercare with one accredited team.

A survey assesses the roof, the shading and your electricity use before any quotation is prepared, and there is no obligation to proceed.

Call 0800 001 6258 or request a survey online.

Solar panels installed on a South West home by SolarGain

Request a Free Solar Survey