• MCS Certified
  • TrustMark Approved
  • Which? Trusted Trader
  • Family Run

Solar Panels Gloucestershire

SolarGain installs solar panels the length of Gloucestershire, on Cotswold stone cottages around Cirencester, Tetbury and Stow, houses in Cheltenham and Gloucester, Severn Vale villages and homes in the Forest of Dean. Designs are built around the roof, your electricity use and any heritage or landscape controls that come with the property.

Solar panels on a barn in Gloucestershire
Covering Cheltenham, Gloucester, Stroud and the CotswoldsFitting can usually start within three weeks.
  • Free survey anywhere in Gloucestershire
  • MCS certified with SEG eligibility
  • Which? Trusted Trader and TrustMark approved
  • Led by Vanessa and Phil Collins
  • Cotswold stone, slate and farm roofs
  • Network applications handled for you
  • Tesla, EcoFlow, Sigenergy, FoxESS and Growatt storage
  • Zero VAT on home solar and batteries

Across Gloucestershire, SolarGain works as an MCS certified, TrustMark approved and Which? Trusted Trader endorsed installer, NAPIT registered, an RECC member and backed by the IWA Deposit Guarantee.

  • MCS Certified
  • TrustMark Approved
  • Which? Trusted Trader
  • NAPIT Registered
  • RECC Accredited
  • IWA Deposit Guarantee

Gloucestershire Solar PV

Solar Panel Installers in Gloucestershire

Town houses, village homes, farms, barns and business premises across the county all get the same full service from SolarGain, from survey to aftercare.

Gloucestershire is one of the keener counties for solar. Figures from Sunsave reported by SoGlos put the share of households with panels at nearly seven per cent as of March 2024, placing the county in the top 25 in England. The landscape is what makes each installation different: the Cotswold hills to the east, the flat Severn Vale through the middle and the wooded Forest of Dean to the west.

Housing ranges from Cotswold stone cottages and farmhouses with stone tiled roofs to Regency townhouses in Cheltenham, Victorian terraces in Gloucester and Stroud, and modern estates on the edges of the larger towns. Much of the east of the county lies within the Cotswolds National Landscape, and many villages have conservation areas, so array position and consent are considered from the first visit.

Whether it's panels alone or panels with storage and car charging, you can see examples of finished work in the SolarGain project gallery.

Nearly 7%Share of Gloucestershire households with solar, March 2024 (Sunsave via SoGlos)
3 WeeksTypical installation availability
GL PostcodesCovering the whole county

Why SolarGain

Three Reasons to Choose SolarGain in Gloucestershire

Certified work, guaranteed for years

SolarGain's credentials include MCS certification, RECC membership, NAPIT accredited installers and a Which? Trusted Trader assessment. Gloucestershire systems come with a two year insurance backed workmanship guarantee plus product and performance warranties from the manufacturers, and deposits are protected by the IWA Deposit Guarantee.

Over 300 jobs across the South West

Across more than 300 South West projects, SolarGain has fitted panels to stone and slate roofs, listed homes and big agricultural buildings, experience that decides the mounting method, layout and scaffold set up on Gloucestershire jobs.

One family team from start to finish

Phil meets each customer in person first. Then the family run team that designs the system also handles the network forms, installs it, commissions it, registers it with MCS and supports you afterwards. Dates are normally free within three weeks.

Across the County

Solar for Gloucestershire's Towns, Villages and Farms

From the Cotswolds to the Forest of Dean, the county's landscapes each bring different roofs and different questions.

Cotswold stone roofs

Stone tiled roofs are heavy and the tiles are fragile and costly to replace. Arrays are designed with specialist hooks and careful tile removal and refitting, and where a stone roof is listed or highly visible, outbuildings and rear slopes are often the better choice.

The Cotswolds National Landscape

Roof mounted panels on homes in the National Landscape are generally still permitted development, though panels on a wall facing a highway and larger ground arrays are more restricted. SolarGain checks the designation and any conservation area at survey.

The Severn Vale

Open, flat land through the Vale gives many homes clear, unshaded roofs. Some properties near the river sit in flood risk areas, so the inverter and battery are placed above likely flood levels.

Farms, barns and the Forest of Dean

Barns and farm buildings across the county offer large roofs for daytime loads such as dairies, workshops and grain stores. In wooded parts of the Forest of Dean the shade analysis matters more, and tree cover can decide which roof is used.

Our Installation Services

Solar Panel Installation Services in Gloucestershire

Solar PV Systems

On a Gloucestershire survey we measure usable roof area, record pitch and aspect, assess shading and inspect the covering, battens and rafters. The panel type, layout and inverter come out of that. Installation includes scaffold, hooks, rails, clamps, flashing, DC and AC cabling, isolators, earthing and bonding, then testing, commissioning and MCS registration.

Home Batteries

Batteries hold back the solar your home doesn't need straight away and release it in the evening. SolarGain fits lithium iron phosphate storage from Tesla, EcoFlow, Sigenergy, FoxESS and Growatt, sized to occupancy, evening demand and tariff, with off peak charging available on a time of use plan. Read more on our solar battery storage page.

Storage for Existing Solar

Panels already on the roof can be paired with a battery without changes to the array, using either an AC coupled unit beside the current inverter or a replacement hybrid inverter, depending on the existing equipment and consumer unit. Our guide to adding battery storage to existing solar panels walks through it.

Car Chargers

Fitting a charger alongside solar lets spare generation go to the car first. Smart chargers including the Zappi and Tesla units track output with a CT clamp, use off peak power overnight and balance load against the supply, which matters on rural properties. See our home EV chargers page.

Monitoring

Systems are connected at commissioning to an app or portal displaying live generation, consumption, battery level and grid flow, with daily, monthly and yearly records, so you can track performance from anywhere.

Upgrades and Extensions

SolarGain also improves existing Gloucestershire systems by replacing inverters, adding panels where roof and inverter allow, fitting optimisers on shaded arrays, adding bird mesh and upgrading monitoring. Each change is checked against the array, inverter capacity and original network approval before quoting.

Suitability

Is Your Gloucestershire Home Suitable for Solar Panels?

Plenty of Gloucestershire homes are good candidates for solar, as long as there's sufficient unshaded roof, the structure is sound and the household's electricity use justifies it. South facing roofs give the most each year, with east and west aspects still productive and spreading output through the day.

Rural and historic properties need extra checks. A stone tiled roof, listed status, a conservation area or the National Landscape can each affect where panels go, and mature trees can shade a roof for part of the year. The survey measures what is actually available and records any consents needed before a quotation is issued.

Solar panels installed by SolarGain across the roofs of a South West housing development
Roofs facing east and west can work wellA survey tells you what your roof will deliver.

During a solar panel survey in Gloucestershire, SolarGain assesses:

  • Usable roof once chimneys, dormers and rooflights are excluded
  • The pitch and aspect of each slope
  • Roof covering, including stone tile, slate, clay or concrete tile and flat membrane
  • Rafter sizing, spacing and the state of battens and felt
  • Shade from buildings, chimneys and mature trees
  • Scaffold access, from village lanes to farmyards
  • Year round electricity demand, including heat pump or EV plans
  • Consumer unit, earthing and cable routes
  • Stone tile condition and fixing method
  • Listed building, conservation area or National Landscape status

Not every roof is ready. A small north facing slope that rarely sees the sun, or a covering nearing replacement, is better tackled once other work is complete. If a heat pump or EV is planned, the system is sized for the demand to come as well as the bills you have now.

The Process

How Are Solar Panels Installed in Gloucestershire?

Fitting solar in Gloucestershire means surveying the building, designing the array, fixing mounts to the roof structure, fitting and wiring the panels, connecting the inverter and commissioning the system.

Every stage is SolarGain's own work, carried out to BS 7671 and building regulations. More on fixings and components is in our guide to how solar panels are installed.

  1. Survey and Design Phil visits, reviews your bills, measures the roof, checks shade and the covering, then specifies panels, inverter and battery around your real demand.
  2. Network Paperwork SolarGain sends the G98 notice or G99 application to your network operator, which for most of Gloucestershire is NGED.
  3. Roof Work Scaffold goes up, stainless hooks are fixed to the rafters and rails and flashing are fitted, with stone tiles lifted and dressed back where needed.
  4. Panels On Panels are clamped in place with the edge clearances from the wind calculation and connected with weatherproof DC cable, isolators and surge protection.
  5. Electrics Our electricians install the inverter, any battery and AC isolators, wired to the consumer unit on a dedicated circuit with correct earthing and bonding.
  6. Sign Off The system is tested, commissioned, registered with MCS and TrustMark, linked to monitoring and handed over with all certificates and documents.
Tesla Powerwall solar battery storage installed by SolarGain

Solar Plus Storage

How Do Solar Panels and Batteries Work Together?

Solar generation goes to the home first. Spare power then charges the battery, and once it's full the rest is exported.

Through the evening the battery supplies lights, cooking, entertainment and overnight loads, avoiding the most expensive grid hours. A time of use tariff lets it charge cheaply overnight as well, and exported power can be paid for through the Smart Export Guarantee.

On its own, a battery doesn't provide backup in a power cut. That needs compatible equipment and a changeover arrangement fitted during installation, which is worth discussing at survey for rural homes. Surplus can also be diverted to an immersion heater or EV charger before export.

  • Tesla
  • EcoFlow
  • Sigenergy
  • FoxESS
  • Growatt

Costs

How Much Do Solar Panels Cost in Gloucestershire?

The price of solar in Gloucestershire is set by the system size in kWp, the roof's layout and covering, the equipment chosen, how easy the building is to reach and whether storage or EV charging is added. The least costly jobs are single slope systems on modern tiles, and a stone tiled roof or large farm system with high capacity storage sits at the other.

What moves the figure on a quotation:

  • Panel numbers and wattage, giving the total kWp
  • String, hybrid or optimiser based inverter set up
  • Battery type and usable capacity
  • Scaffold height and access, which varies from narrow village lanes to open farmyards
  • Number of roof faces, since splitting an array adds cable and labour
  • Stone tile hooks, slate hooks, sheet roof fixings or in roof mounting
  • Consumer unit work, surge protection, earthing and cable runs
  • Bird mesh and EV charger connection

You get a fixed price in writing after the survey, based on your property and usage. Payments can be spread through Hometree solar finance.

Tax Relief

VAT free solar and storage for homes

Under the energy saving materials relief, domestic solar panels and batteries are currently charged at 0% VAT, cutting the upfront cost of qualifying work.

0%VAT on qualifying work
FixedQuotation after survey

Expected Output

How Much Electricity Can Solar Panels Generate in Gloucestershire?

A system's yearly output depends on its kWp, the direction and angle of the roof, any shading and the sunlight available on site. Across Gloucestershire, a well sited system typically produces in the region of 900 to 1,050 kWh a year for every kWp, so a 4kWp home array would usually generate around 3,600 to 4,200 kWh.

An open south facing roof at about 35 degrees reaches the top of the range. East and west splits fall slightly short, and partly shaded roofs fall further. Most generation happens between April and September, winter output comes from diffuse daylight at a far lower level, and the gradual yearly decline in panel output is covered by the performance warranty.

900–1,050 kWhTypical annual output per kWp installed on a well sited roof
1,440 hrsAverage annual sunshine at the Met Office Cheltenham station
Site specificYour survey produces a generation estimate for your own roof
EcoFlow battery storage installed at a home in Taunton, Somerset

South West Installation Case Study

10.87kWp Solar PV in Taunton, Somerset

The 10.87kWp Taunton system pairs a slate roof array with battery storage and app monitoring. Although it's in Somerset, the same design, mounting and storage approach applies to homes and farm buildings across Gloucestershire. Details are on the 10.87kW Taunton case study page.

Grid Connection

What Are DNO, G98 and G99 Requirements in Gloucestershire?

Most Gloucestershire addresses, from Cheltenham and Gloucester to Stroud and the Forest of Dean, connect to the National Grid Electricity Distribution (NGED) network. Some properties in the east of the county are on Scottish and Southern Electricity Networks (SSEN), so SolarGain checks the MPAN on your bill before applying. The route depends on inverter size:

  • G98 covers systems up to 16 amps per phase, about 3.68kW on a single phase home, with SolarGain notifying the operator after switch on.
  • G99 is needed for anything bigger, and must be approved before the system connects.

Farm systems, three phase supplies, larger arrays and installs with sizeable storage usually need G99, and SolarGain handles the submission and any export limit attached to it.

Certification

What Are MCS Requirements?

The Microgeneration Certification Scheme sets UK standards for designing and installing small renewable systems. Certified installers use approved products, follow MCS rules on design, wind loading and roof fixing, and provide a performance estimate up front.

After installation your system is registered and an MCS certificate is issued, which suppliers ask for before paying Smart Export Guarantee tariffs. It also supports the building regulations notification SolarGain handles through NAPIT.

Planning

Do You Need Planning Permission for Solar Panels in Gloucestershire?

For most homes, no. Rooftop panels in Gloucestershire generally fall within permitted development, so no planning application is required.

Panels must not project more than 200 millimetres from the roof, must not go above the ridge, should be sited to reduce their visual effect, and must be removed once out of use. The county's listed buildings, conservation areas and protected landscapes bring more exceptions than most.

Listed Buildings and Conservation Areas

Listed buildings need listed building consent, and many Cotswold and Severn Vale villages have conservation areas where panels facing a highway are more tightly controlled. Rear slopes and outbuildings are usually the starting point.

The Cotswolds National Landscape

Within the National Landscape, roof panels on a house are generally permitted, though panels on a wall facing a highway are not, and ground mounted arrays face tighter limits.

Farms, Barns and Ground Mounts

Agricultural and commercial buildings have their own permitted development allowances. Ground mounted arrays carry size and siting limits, and larger field systems need a planning application.

Planning in Gloucestershire is handled by six district councils: Cheltenham, Cotswold, Forest of Dean, Gloucester, Stroud and Tewkesbury. Each holds the records of listed buildings, conservation areas and Article 4 directions for its area. For general guidance, see the Planning Portal. SolarGain reviews constraints at survey, and the relevant district council can confirm listed status or designated land.

Areas Covered

Solar Panel Installation Areas Across Gloucestershire

SolarGain's county wide coverage takes in every part of Gloucestershire for solar panels, batteries and EV chargers, as part of our wider South West service.

Towns and Cities

  • Cheltenham
  • Gloucester
  • Stroud
  • Tewkesbury
  • Cirencester
  • Dursley
  • Stonehouse
  • Bishop's Cleeve

The Cotswolds

  • Tetbury
  • Stow on the Wold
  • Moreton in Marsh
  • Bourton on the Water
  • Chipping Campden
  • Winchcombe
  • Painswick
  • Nailsworth

Severn Vale and Forest of Dean

  • Newent
  • Lydney
  • Coleford
  • Cinderford
  • Berkeley
  • Frampton on Severn
  • Newnham
  • Mitcheldean

Customer Reviews

What SolarGain Customers Say

SolarGain holds a 5.0 rating on Google Reviews. Examples of finished installations are in our solar panel gallery.

“Phil Collins and his team have just installed our solar panels and battery system. We are very pleased with the professionalism, dedication, and teamwork that SolarGain has demonstrated. Phil is very knowledgeable and has kept us informed throughout the whole process.”
Paul ButcherGoogle Review
“Five stars for an exceptional, high-tech installation! Phil and Vanessa at SolarGain were absolutely brilliant from start to finish. Despite major external hold-ups, Phil and Vanessa kept me completely informed the entire time.”
DerekGoogle Review
“Cannot say anything other than positive about SolarGain, Phil, Vanessa and team. A brilliant installation and service from start to finish. I would massively recommend them if you are looking for solar energy.”
John IoizidesGoogle Review

FAQs

Solar Panels Gloucestershire FAQs

Can solar panels be fitted to a Cotswold stone roof?

Yes, though it takes more care than a tiled or slate roof. Stone tiles are heavy, laid in diminishing courses and easily broken, so selected tiles are lifted, specialist hooks are fixed to the rafters, and the tiles are dressed back around them. Where the house is listed or the roof is prominent, an outbuilding or rear slope is often the better location, and any consent is identified at survey.

Do I need permission for solar panels in the Cotswolds National Landscape?

For most houses, roof mounted panels are still permitted development inside the National Landscape. Panels mounted on a wall that faces a highway are not, and ground mounted arrays face tighter limits. Listed buildings and conservation areas need their own consents. SolarGain checks the designations that apply to your property before designing the system.

Can I have a ground mounted solar array on my Gloucestershire land?

Often, yes. Permitted development allows a modest ground array on land around a house, within set limits on size, height and distance from the boundary, and with tighter rules in protected landscapes. Larger arrays need planning permission. Ground mounts are useful where the house roof is shaded, listed or stone tiled, and the cable runs underground to the property.

Can solar panels go on a barn or agricultural building in Gloucestershire?

Yes, and farm roofs are often large, unshaded and close to daytime loads such as milking parlours, workshops and grain dryers. The survey checks the roof sheeting, purlins and structure, and whether older sheets need specialist handling. Agricultural buildings have their own permitted development rules, and larger systems usually need G99 approval from the network operator.

Which network operator serves my Gloucestershire property?

Most of the county is on the National Grid Electricity Distribution network, with a small number of eastern properties on the Scottish and Southern Electricity Networks network. Your electricity bill shows the MPAN, which identifies the operator. SolarGain confirms this at survey and submits the G98 notification or G99 application to the correct company.

Does solar make sense for a rural Gloucestershire home off the gas grid?

It often does. Homes heated by oil, LPG or electric storage heaters tend to use more electricity, and many are considering a heat pump. Solar covers daytime demand and summer hot water, a battery shifts generation into the evening, and the system can be sized against the expected demand of a future heat pump or electric car.

Next Step

Arrange Your Gloucestershire Solar Survey

From Cotswold cottages to Severn Vale farms, Gloucestershire customers get one accredited family run team for design, consents advice, the network application, installation, MCS certification and aftercare.

A quote only follows once Phil has visited to assess the roof, shading and your electricity use, and you're free to decide not to proceed.

Speak to us on 0800 001 6258 or arrange a survey online.

Solar panel array on a Gloucestershire barn roof